The jobs that come after new construction: HVAC, landscaping, fences and more

A new house is one permit and a long list of later jobs: HVAC, plumbing fixtures, fences, driveways, lawns, irrigation, pools and solar. Which trades come in when, how to tell from the permit how far along a build is, and when to reach the builder or the new owner.

Watch on YouTube

A permit for a new house looks like one job, and it's really the start of a dozen. The builder frames, roofs and closes up the house. Around that work, and long after it, other trades get hired: some by the builder, many by the owner once they move in. If you know the order those jobs come in, a new-construction permit tells you who will need you, and roughly when.

The order of the work

Every build is different, but the trades tend to arrive in the same order:

  1. Site work: clearing, grading, foundations, temporary fencing and the dumpster that stays on the lot for months.
  2. Rough-in: HVAC ducts and equipment, plumbing lines and electrical wiring, while the walls are still open. The builder usually hires these trades.
  3. Finishes: drywall, flooring, cabinets, fixtures, lighting and paint.
  4. Outside, near the end: the driveway and walkways, the fence, the lawn or sod, irrigation and landscaping. The lot is bare when the builder leaves, and the owner often hires this work separately.
  5. After move-in: a pool, a patio or pergola, solar, window coverings, security, and the services that come back every season or every week: lawn care, pest control, pool service, HVAC maintenance.

Your trade decides which stage is yours. A plumber or an HVAC company wants the builder at the rough-in stage; a fence or landscaping company wants the house that is nearly done; a pool company or lawn service wants the new owner.

Two customers on every new build

The builder. A builder who pulls permits all year hires the same trades again and again. Being on that list brings steady work, and the permit names the contracting business, so you know who to call. One good job for a busy builder is worth more than any single house.

The owner. Once the build is done, the property becomes the customer for everything the builder doesn't include. New owners are setting up a house from scratch: they're choosing a lawn service, a fence and someone to keep the HVAC running, often all in the same few weeks.

Read how far along the build is

The permit record tells you where a job stands:

Cities publish these statuses and dates differently. Some record a final inspection date; others only change the status.

Let FirstDig watch the timing for you

A routine that works

Stay within the rules

Permits are public records, but how you contact people is regulated. Respect local rules on door-to-door visits and no-solicitation signs, address mail to the current resident, and never present yourself as working with the city or the builder unless you do.

Related guides

The numbers right now

In the 30 days to 2026-10-28, 7,969 new construction permits were filed in the 91 cities and counties FirstDig covers.

Get the new permits in your service area by email: start free (14 days of Pro, no card needed).